Serving Noblesville & Hamilton CountyCall (463) 283-5412

From 1,134 residents in 2000 to 8,503 in 2020

Asphalt Paving in McCordsville, IN

Most driveways here are young. The right care now keeps them that way.

  • Free on-site estimates
  • Base depth and asphalt thickness written into every quote
  • Right-of-way and 811 locate steps planned before digging

Young Driveways in a Young Town

Asphalt paving in McCordsville is mostly about new and newer homes. The town was platted in 1865 and named for the McCord family, who had a store here, but it did not incorporate until 1988. Growth came later and fast: 1,134 residents in 2000, 4,797 in 2010 and 8,503 in 2020. The median age at the last census was 35.6, and most driveways in town are less than 20 years old.

New construction

For new homes, the driveway goes in near the end of the build. Lots that have had months of heavy construction traffic often have ruts and soft spots under the topsoil. Before paving, we check the subgrade, replace soft areas with stone and compact the base to full depth. Rushing this step is why some new driveways crack at the street in their first winter.

The first sealcoat

New asphalt should cure 3 to 6 months before the first sealcoat, according to HomeGuide. For a driveway installed in summer, that often means sealing the following spring. After that, resealing every few years when the surface turns gray keeps the binder from drying out.

Early cracks

Small cracks in a young driveway are normal as the base settles. Sealing them before winter keeps water out. Cracks that widen quickly, or that form a web pattern, are a sign of base problems and should be checked.

Associations

Most McCordsville subdivisions have homeowners associations. If you want to widen a driveway, add a pad or change materials, the HOA may want to approve it. We give you a written scope to submit.

A typical new-build scope

For a new home, a driveway estimate here usually covers: checking the subgrade after construction traffic, cutting out soft or rutted areas, placing and compacting 6 to 8 inches of stone, and paving 2 to 3 inches of hot mix, with edges backfilled once the lawn is graded. If you plan to park a camper or work truck, we build that area heavier.

Ten years in

The earliest of the new subdivisions are reaching 15 to 20 years. Driveways there may show long cracks, gray surfaces and the first soft spots near the street. Crack sealing, spot repairs and a sealcoat are usually all they need at this stage.

What we put in writing

Every quote lists the base depth, asphalt thickness, dimensions and the price of each part, which is also what most HOAs ask for when they review a driveway change.

Timing

New-construction paving is easiest from late spring through early fall. If your home closes in winter, a compacted stone drive can serve until paving weather returns, and we pave on top of it in spring.

Building on flat ground

Northern Hancock County is flat, and new subdivisions rely on careful grading to move water to storm inlets and ponds. We match driveway slopes to the lot's drainage plan so water does not collect at the garage or the apron. Call (463) 283-5412 or

Get a Free Estimate

.

McCordsville at a Glance

  • Rapid growth. McCordsville grew from 1,134 residents in 2000 to 4,797 in 2010 and 8,503 in 2020.
  • Young population. The median age was 35.6 at the 2020 census.
  • Late incorporation. The town was platted in 1865 and named for the McCord family's store, but did not incorporate until 1988.
  • Size. McCordsville covers about 7.14 square miles of land in Vernon Township, Hancock County.
Sealcoating in Noblesville, IN

McCordsville Questions

When should our new driveway get its first sealcoat?

After 3 to 6 months of curing. If it was paved in late summer or fall, plan on sealing the next late spring or summer.

Our new driveway already has cracks. Is something wrong?

Hairline cracks from settling are common. Wider cracks, cracks in a web pattern or sinking areas point to base problems and should be looked at.

Can you widen our driveway for a third car?

Yes, if your HOA approves. We build the added width with the same base depth and a clean seam to the original.

Do you work with builders?

Yes. We schedule paving after heavy construction is finished so the new surface is not damaged.

What base depth do you use on new driveways?

Typically 6 to 8 inches of compacted stone under 2 to 3 inches of asphalt, in line with HomeGuide's residential guidance, and more where heavier vehicles park or the ground is soft.

Can you seal several driveways on one street?

Yes. Neighbors sometimes book the same day. Each driveway is prepped and priced on its own.

Does a new driveway need sealing right away?

No. Fresh asphalt needs 3 to 6 months to cure before the first coat.

Free Estimates in McCordsville, IN

Free estimates for McCordsville driveways, new and nearly new.

Call Now: (463) 283-5412